CAIBA’s operations take place at its two main manufacturing plants:
The company’s general management and administration divisions are based at this plant of 15.000 square meters, which boasts modern installations, the most advanced machinery in the sector and a strategic geographical location for both the domestic and international markets.
The plant has one- and two-phase machinery for the annual production of 108 million containers and 650 million preforms in different formats.
see location map
Opened in 1998, the plant is in the province of Jaén, the world’s leading olive oil producing region..
It is equipped with one- and two-phase injection and blow-moulding machinery and has a production capacity of 300 million containers and 500 million preforms. It also has a moulding workshop and a quality control laboratory to guarantee optimum manufacturing conditions.
see location map